Sign In | Join Free | My polstate.com
China Weifang Shihua Chemical Building Material Co., Ltd. logo
Weifang Shihua Chemical Building Material Co., Ltd.
Weifang Shihua Chemical Building Material Co., Ltd.
Verified Supplier

1 Years

Home > PU Waterproof Coating >

Two Component Polyurethane Leak Proof Coating For Tunnel And Utility Tunnel

Weifang Shihua Chemical Building Material Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Two Component Polyurethane Leak Proof Coating For Tunnel And Utility Tunnel

Supply Ability : 1000000kg per Month

Mixing Ratio : Weigh A & B strictly by weight ratio; wrong ratio causes uncured sticky or brittle film

Brand Name : shhous

Substrate Requirement : Dry solid substrate preferred; interface treatment required for damp surface

Model Number : two‑component

Application Method : Cold‑applied by troweling or brushing

MOQ : 1000㎡

Low‑temperature Flexibility : No cracking at ‑35 ℃

Price : USD 1.5‑1.8/kg

Chemical Resistance : Resistant to water, acid, alkali and salt corrosion

Packaging Details : Metal Barrel

Stirring : Electrically stir 3-5min until uniform; poor mixing causes partial curing failure

Certification : ISO

Cured Film Appearance : rubber‑like elastic film after curing

Place of Origin : Shandong, China

Waterproofness : No water penetration at 0.3 MPa for 120 min

Contact Now

Two‑Component Polyurethane Waterproof Coating Construction Technology

1. Construction Preparation

  1. Material preparation: Verify model of component A & B, confirm mixing ratio. Prepare stirrer, trowel, brush and measuring tools.
  2. Substrate condition: Solid, flat and dry substrate; free of dust, oil and loose particles. Repair cracks and holes with repair mortar. Interface treatment for damp substrate. Standing water on surface is forbidden.
  3. Ambient condition: Construction temperature: 5℃‑35℃. Do not apply in rainy or dewy weather.

2. Detail Reinforcement Treatment

Apply extra reinforcement layer for weak waterproof positions: internal‑external corners, pipe roots, floor drains, construction joints and deformation joints. Apply 1‑2 thin coats of mixed coating. Extra‑layer width ≥250mm on each side. Start main‑area construction after reinforcement layer dries.

3. Proportioning & Mixing

Weigh component A and component B strictly according to weight ratio and pour into mixing bucket. Electrically stir for 3‑5 minutes until uniform color without lumps or particles.

Important: Mixed material has limited pot‑life. Discard gelled mixture. Do not dilute with water.

4. Multi‑layer Main‑surface Application

Mainly trowel‑applied, assisted by brushing. Apply thin coats repeatedly; heavy single‑coat is prohibited. Apply first thin coat. Next coat can only be started after previous coat is dry. Brush in cross directions to reach designed film thickness.

5. Curing

Natural curing for each coat. Ensure full curing after whole application. Protect film from rain, ponding, treading and mechanical damage during curing.

6. Protective Layer Construction

Apply cement‑mortar protective layer after full curing and inspection acceptance.

Notice: Polyurethane film is not UV‑resistant. Direct exposure is not allowed. Protective covering is required for exposed areas.

7. Notes

  1. Accurate A‑B mixing ratio is critical. Wrong ratio causes sticky uncured film or brittle film.
  2. Keep good ventilation on site, avoid long‑term inhalation of volatile gas.
  3. Clean tools with special cleaner before material curing.

Key Construction Points

No. Item Precautions
1 Substrate Substrate must be solid & dry, free of standing water, dust and oil; interface treatment required for damp surface
2 Mixing Ratio Weigh A & B strictly by weight ratio; wrong ratio causes uncured sticky or brittle film
3 Stirring Electrically stir 3-5min until uniform; poor mixing causes partial curing failure
4 Pot-life Use up within pot-life after mixing; discard gelled material, do not dilute with water
5 Coating Layers Apply thin multi-coats in cross directions; avoid heavy coat to prevent blistering & sagging
6 Temperature/Humidity Construct at 5℃-35℃; low temp slows curing; avoid rainy and dewy days
7 Ventilation Keep ventilated, avoid inhaling volatile gas, wear protective equipment
8 Details Apply extra reinforcement layer on corners, pipe roots and floor drains first
9 No Direct Exposure Film is not UV-resistant; mortar protective layer mandatory for exposed areas
10 Tool Cleaning Clean tools with special cleaner before curing; hard to clean after curing
11 Curing Protection Avoid rain, ponding, treading and sharp-object damage during curing
12 Moisture Content Standing water reduces adhesion and causes blistering; moisture content must meet requirement

Two Component Polyurethane Leak Proof Coating For Tunnel And Utility Tunnel


Product Tags:

two component polyurethane leak proof coating

      

tunnel polyurethane waterproof coating

      

tunnel polyurethane leak proof coating

      
Wholesale Two Component Polyurethane Leak Proof Coating For Tunnel And Utility Tunnel from china suppliers

Two Component Polyurethane Leak Proof Coating For Tunnel And Utility Tunnel Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Weifang Shihua Chemical Building Material Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)